Tundra Times Volume 14, Number 7 (February 16, 1977)
Page 1
[view articles]
[masthead]
[news lead] Airport Bill Aimed at Atka Isolation
[news lead] Suit Charges Ramos Was 'Scapegoat'
[news lead] Carter Begins to Move on Indian Affairs
[advertisement]
[news lead] Dr. Hiatt Resigns
[news lead] The Gas Squeezer: the Central Gas Compressor Plant is Located on Atlantic Richfield's Side of the Prudhoe Bay Field and is Comprised of 30 Large Modular Buildings. Eight of These Modules Make-up the Field Fuel Gas Unit Which Will Provide Natural Gas for All Prudhoe Facilities and Four Pump Stations Along the Trans Alaska Pipeline. the Remaining Gas Will be Reinjected into a Sub0surface Reservoir through Injection Wells That Are Being Drilled by Two Rigs on the Far Background. the Prudhoe Bay Field Contains 26 Trillion Cubic Feet of Gas
Page 2
[view articles]
Page 3
[view articles]
Page 4
[view articles]
Page 5
[view articles]
Page 6,7
[view articles]
Page 8
[view articles]
Page 9
[view articles]
Page 10
[view articles]
Page 11
[view articles]
Page 12
[view articles]